Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
-
Field
-
Division (TEC-SE): responsible for supporting projects for the engineering of E2E systems, the associated security aspects, E2E systems integration/verification activities (SIV) and service preparation. TEC
-
and most practical way forward; overseeing ground segment system security verification and validation activities, ensuring alignment with assurance requirements and agreed compliance levels; enhancing
-
Weather System, including software applications, required ground systems, hosted payloads and small satellite missions. The Office is also responsible for implementing Space Weather related projects outside
-
, integration, verification and deployment of ground segment facilities (hardware and software) and services, such as security, communications, operations and maintenance, in a security environment. You must have
-
and verification. You will translate new architectural concepts into integrated circuit implementations and evaluate their performance through measurements on fabricated silicon chips. You will
-
aperture synthesis) and testing (calibration and performance verification). You are encouraged to visit the ESA website: http://www.esa.int Field(s) of activity/research for the traineeship As a trainee, you
-
to completion, including milestones and reviews, on the segment and element procurement processes where new technologies and modern software technologies applicable to the ground segment play a major role
-
and processes and controlling implementation of applicable requirements; ensuring the implementation of the software PA requirements; ensuring the preparation of design trade-offs, analyses and reports
-
, verification and deployment of ground segment facilities (hardware and software) and services (security, communication, operations and maintenance) in a security environment. You must have at least five years of
-
-level circuit design, and detailed simulation and verification. The developed architectures will be implemented as integrated circuits and validated through measurements on fabricated silicon chips. With