Sort by
Refine Your Search
-
Rodrigues da Cruz. Grant duration: Initial duration of 12 months, with the predicted starting date in May 2026, on an exclusive basis, eventually renewable but never exceeding the project duration. If it is
-
with industrial application using sensor systems, systematized software production and scientific production and writing, designing, building and testing laboratory prototypes for predictive maintenance
-
tweezers to control, orient, and destabilize the emulsions in order to release the substance at the target site, which will be evaluated by microscopy and image analysis. Legislation and regulations: Law Nº
Searches related to model predictive control
Enter an email to receive alerts for model-predictive-control positions