3 model-predictive-control Master positions at FEUP

Sort by

Refine Your Search

  • FEUP | Portugal | about 3 hours ago

    Rodrigues da Cruz. Grant duration: Initial duration of 12 months, with the predicted starting date in May 2026, on an exclusive basis, eventually renewable but never exceeding the project duration. If it is

  • FEUP | Portugal | 3 months ago

    with industrial application using sensor systems, systematized software production and scientific production and writing, designing, building and testing laboratory prototypes for predictive maintenance

  • FEUP | Portugal | 2 months ago

    tweezers to control, orient, and destabilize the emulsions in order to release the substance at the target site, which will be evaluated by microscopy and image analysis. Legislation and regulations: Law Nº

Enter an email to receive alerts for model-predictive-control positions