Sort by
Refine Your Search
-
not possible to ensure the duration of 12 months estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided that the minimum duration of 3
-
3); (iv) To estimate the environmental and human risks of using wastewater for irrigation (Activity 4) by applying risk assessment models; (v) Participate in disseminating project results
-
5 Feb 2026 Job Information Organisation/Company FEUP Department Human Resources Division Research Field Engineering » Electrical engineering Engineering » Computer engineering Engineering
-
exceeding the project duration. If it is not possible to ensure the duration of estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided
-
on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted
-
. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided that the minimum
-
the predicted starting date in April 2026, on an exclusive basis, eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated in the previous
-
, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted
-
, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 12 months estimated in the previous paragraph, this duration will be adjusted