Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
-
Field
-
, schedule and programme cost requirements; ensuring proper integration of the subsequent NovaMoon builds’ payloads into the identified lander opportunities; preparation of the subsequent operational phase
-
Projects Department: Sterna project: Sterna is the operational follow-on to the Arctic Weather Satellite (AWS) and forms part of the EPS-Sterna programme implemented in cooperation with EUMETSAT
-
Location ESTEC, Noordwijk, Netherlands or EAC, Porz-Wahn, Germany Description The Directorate of Human and Robotic Exploration (D/HRE) is a programme directorate within the ESA matrix structure
-
-NASA MAGIC constellation, and is currently preparing the start of phase B2 as a mission of opportunity within the FutureEO-1 Programme. The objective of MAGIC is the long-term accurate monitoring
-
Location ESTEC, Noordwijk, Netherlands Description Initiated in 2017, the NAVISP programme has been operational for almost nine years. In that time, it has become a key enabler for innovation and
-
the implementation of EOGS. Location ESTEC, Noordwijk, Netherlands Description European Resilience from Space – Earth Observation (ERS-EO) Architecture and Upstream Manager. You will report to the ERS-EO Programme
-
Location ESTEC, Noordwijk, Netherlands Description National Projects and European Resilience from Space – Earth Observation (ERS-EO) Manager. You will report to the ERS-EO Programme Manager within
-
Location ESRIN, Frascati, Italy Description ERS-EO/Downstream Ground System Engineer in the ERS-EO Programme (European Resilience from Space – Earth Observation Programme). The overall objective
-
Location ESTEC, Noordwijk, Netherlands Description Galileo Ground Segment Delivery Manager in the Galileo Ground Segment Management Office, Galileo and EGNOS Programme Department, Directorate
-
trajectories, including surface descent and ascent; parametric optimisation, taking different configurations into account; computing atmospheric entry trajectories and launch windows; propellant budget analysis