2 parallel-programming-"the"-"Humboldt-Stiftung-Foundation" positions at California Institute of Technology
Sort by
Refine Your Search
-
fabrication and qualification of a planned 1.2-meter diameter, 120-meter-long demonstration tube, to be erected in the new purpose-built CEBEX laboratory at the LIGO Hanford Observatory (LHO). In parallel
-
demonstration tube, to be erected in the new purpose-built CEBEX laboratory at LHO. In parallel, the chosen candidate will take a lead role in forging results of these investigations into a conceptual design
Enter an email to receive alerts for parallel-programming-"the"-"Humboldt-Stiftung-Foundation" positions