Sort by
Refine Your Search
-
Listed
-
Field
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Dra. Daniela Sofia de Castro Falcão. Grant duration: Initial duration of 6 months, with the predicted starting date in November
-
the University of Porto (FEUP), under the scientific supervision of Doctor Maria José Fernandes Sampaio. Grant duration: Initial duration of 9 months, with the predicted starting date in November2025, on
-
duration: Initial duration of 3 months, with the predicted starting date in November 2025, on an exclusive basis, eventually renewable but never exceeding the end of the project. If the contracting
-
Engineeringof the Faculty of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor Bárbara Rangel Carvalho. Grant duration: Initial duration of 6 months, with the predicted
-
Sara Maria Pinho Ferreira. Grant duration: Initial duration of 6 months, with the predicted starting date in October 2025, on an exclusive basis eventually renewable but never exceeding the project
-
signing the contract. Activity Outline: The Health24towers project aims to research and develop an intelligent and predictive monitoring system for telecommunications tower infrastructure. The proposed
-
, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Professor António José Coelho Dias Arêde. Grant duration: Initial duration of 12 months, with the predicted starting date in
-
the predicted starting date in September of 2025, on an exclusive basis eventually renewable for equal periods, in any case confined to the project duration. If the contracting procedures do not allow
-
. Grant duration: Initial duration of 6 months, with the predicted starting date in october 2025, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible