Sort by
Refine Your Search
-
Employer
-
Field
-
Description A call for applications is open for a Research Grant (BI) within the scope of the project “I-Rewater - Sustainable management of water resources in irrigated agriculture in the SUDOE area”, with
-
Holder, approved by Law No. 40/2004, of August 18, in its current wording; FCT, I.P. Research Grant Regulations, in force (https://www.fct.pt/apoios/bolsas/docs/RegulamentoBolsasFCT2019.pdf ); Regulation
-
for a research grant within the framework of project ASAP-WATER - Assessing the Potential of Reclaimed Wastewater as a Resource for Sustainable Agricultural Practices, with number 16334 and operation code
-
25 Feb 2026 Job Information Organisation/Company FEUP Department Human Resources Division Research Field Engineering » Civil engineering Environmental science » Other Engineering » Water resources
-
: Hydrology, Water Resources, Data Science, and Computing Admission requirements: BSc or MSc degrees in one of the following areas: Civil Engineering, Computer Engineering, Environmental Engineering, Physical
-
involved in: i) conducting trials in growth chambers with several chickpea genotypes under water and heat stress; ii) evaluating growth, gas exchange, and other physiological parameters; iii) collecting
-
. Operating analytical instruments, including, but not limited to, pH meters, microbial incubators, water filtration units, spectrometer UV-Vis, agitation plates, and TOC analysers. Operating liquid
-
to present the certificate to sign the contract. More information is available on: https://www.dges.gov.pt/pt/pagina/reconhecimento Workplan and the objectives to achieve: The final approach phase
-
the physical-chemical characterization of thermal waters and selected agro-industrial raw materials (and their residues and by-products); - in extraction processes (extrusion, solid-liquid, supercritical, etc
-
CIIMAR - Interdisciplinary Center of Marine and Environmental Research - Uporto | Portugal | about 2 months ago
. Duration of the grant: Duration of 12 (twelve) months starting on 1st April 2026, under the regime of exclusive dedication. Monthly Maintenance stipend: The monthly maintenance allowance is 1090.98