Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
-
Field
-
activities for G2A satellite design, manufacturing, AIV/AIT, qualification and on-ground acceptance, in line with agreed technical, schedule and cost requirements, with minimum risk; managing activities
-
invitation to tender through to flight commissioning, ensuring compliance with the schedule, technical requirements and budget. Ensure the smooth integration of payloads and oversee the coordination between
-
scheduling and help with housing for expat employees. Please visit our websites for more information about our terms of employment: https://www.cwi.nl/jobs/terms-of-employment and https://www.nwo-i.nl/en
-
: contributing to managing engineering activities for the design, development, qualification, acceptance and validation of payloads within the Secure Connectivity Space Segment, adhering to agreed schedule, cost
-
for the design, development, qualification, acceptance and validation of satellites/platforms within the Secure Connectivity Space Segment, adhering to agreed schedule, cost and technical requirements, including
-
; preparing surveys (including user surveys) and reports; preparing implementation plans and schedules, including budget planning and execution monitoring; evaluating and making recommendations for improvement
-
within the Secure Connectivity system of systems, within the agreed schedule, cost and technical requirements, including implementation of the applicable security requirements; management of the overall
-
-BI) supports the Head of Infrastructure and Value Chain in the management of programme and project activities relating to cost, schedule, risk and other controlling activities. Duties You will lead the
-
applications submitted through our website will be considered. You can apply up and until Sunday 14th of September 2025. The first interviews are scheduled for the 2nd half of September 2025. Procedure As part
-
problem areas and proposing mitigation actions where appropriate; contributing to the management of the schedule and proposing schedule risk mitigation actions; following up programmatic aspects as