88 programming-languages-"the"-"CNRS"-"U"-"UCL"-"FEMTO-ST-institute" positions at European Space Agency in Netherlands
Sort by
Refine Your Search
-
-specific solutions on all aspects of the application lifecycle (plan/build/run), including timelines, resources, and delivery. Your tasks and responsibilities will include the following: Strategic
-
, test plan definition and implementation schedule; Design and or modify the laboratory test set-up (generally by tailoring existing set-ups as required); Commission and characterize the test set
-
This is a non-renewable post for a limited duration of 4 years. Location ESTEC, Noordwijk, Netherlands Description The Directorate of Human and Robotic Exploration Programmes is a programme
-
, or working with databases, is also valuable. Academic or professional proficiency with the programming languages and frameworks currently used in the project is required, specifically Python, TensorFlow, Keras
-
This is a non-renewable post for a limited duration of 4 years. Location ESTEC, Noordwijk, Netherlands or ESA Headquarters, Paris, France Description Programme Controller in the Business
-
Division, Systems Department, Directorate of Technology, Engineering and Quality. The Future Engineering Division, in support of the programme directorates, is responsible for developing and providing
-
Exploration Envelope Programme (E3P) is integrating the ESA activities in this field to ensure a single exploration process. The strategy includes three destinations where humans will work with robots to gather
-
regarding the definition of the validation activities; preparing test documentation (test requirements, test plan and test report); defining payload validation activity test setups and planning; implementing
-
initiatives. The European Exploration Envelope Programme (E3P) is integrating the ESA activities in this field to ensure a single exploration process. The strategy includes three destinations where humans will
-
, initiating and managing industrial contracts for the study and risk-retirement of new optical payload systems, according to the agreed activity plan; defining, negotiating, initiating and managing risk