136 evolution "https:" "https:" "https:" "https:" "https:" "ESPCI Paris PSL" "ESPCI Paris PSL" uni jobs at European Space Agency in Netherlands
Sort by
Refine Your Search
-
of Navigation. The Galileo teams are in charge of the design, development, procurement, integration and qualification of the Galileo system, including the constellation of satellites in medium Earth orbit and the
-
communication links, at system, subsystem, element and equipment level. It covers the missions from study phase to definition of requirements, design, development, security integration / verification, and
-
or the Division and supporting the definition of European standards related to the Section’s domain of competence; ensuring the development, maintenance and evolution of the engineering tools used by the Division
-
section as input for the development and maintenance of the services and operational infrastructure serving the missions; the maximisation of the scientific return by fostering cross-mission data
-
Department, Directorate of Operations. The Optical Technologies Section provides engineering matrix support to ESA programmes and leads the development of ground-based optical assets and standardisation and
-
) for the Galileo programme; reviewing the proposed mission-level evolution for security and assessing the impact on the ground segment security baseline; managing the ground segment security baseline for the Galileo
-
; the development of future space platforms; project tender evaluation boards and reviews; concurrent Design Faciliity (CDF) studies relating to the systems engineering domain. Duties Space Segment Systems Engineer
-
Department, Director General's Services. Under the direct authority of the Head of the Corporate and Institutional Communication Office, you will be responsible for the development and implementation
-
approval, ensuring the hand-over to the Project Department for implementation; as Technical Officer, defining, negotiating, initiating and managing industrial activities for the preparation and development
-
procurement processes are timely, compliant and strategically aligned; undertaking in-depth analyses and case studies on soft FM-related matters and leading the development and harmonisation of facility