Sort by
Refine Your Search
-
Listed
-
Field
-
); and you will carry out a mixed-methods study on the feasibility and preliminary effectiveness of the program (Study 5). You will: Manage the project, including scheduling meetings with the supervisory
-
the project, including scheduling meetings with the supervisory team, preparing agendas, and documenting meetings and research activities; Design and prepare the studies (e.g., conduct a study in which
-
the equivalent of 0.2 fte. The way your teaching is organized is negotiable. It is possible to schedule a teaching semester or to spread your teaching over a longer period of time. The preferred starting date is 1
-
performance evaluation within the first 12 months. As part of your contract, you will (co-)teach the equivalent of 0.2 fte. The way your teaching is organized is negotiable. It is possible to schedule a