Sort by
Refine Your Search
-
learning applications to improve project cost, risk, and schedule performance Please state your entry requirements plus any necessary or desired background A first class or an upper second class British
-
overnight stay for post anaesthesia recovery. The needed post-operative care is predicted manually based on a pre-operative assessment for surgeries case selection to be scheduled for each day. This decision
-
engaging schedule of internal and external seminars. You will also have the opportunity to be part of the Scottish Graduate Programme in Economics (SGPE)—a collaborative network of eight leading Scottish
-
stoppages. However, in most of the industries, OEM specifications are used to maintain the equipment’s/machineries which are often based on schedules and preventive strategies. It has been observed
-
/3c52o8bnrCuLpzLq7 via the above ‘Apply’ button. Closing Date: 21st May 2025 Interviews are scheduled for 28th of May.
-
will be scheduled for week commencing on 23.06.2025. This is a 3-year studentship, funded by Dr Russo’s NIHR project, and comes with an annual tax-free stipend of £19,688. Student tuition fees will be
-
To improve the availability and reduce the overhaul and maintenance (O&M) costs of gas turbine propulsion systems, the gas turbine industry is moving from scheduled maintenance to condition-based