Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
- Universidade de Coimbra
- Universidade do Algarve
- Universidade Católica Portuguesa - Porto
- Politécnico de Leiria
- Instituto Politécnico de Coimbra
- Instituto Superior de Agronomia
- Instituto Superior de Engenharia do Porto
- University of Algarve
- CIIMAR - Interdisciplinary Center of Marine and Environmental Research - Uporto
- INESC COIMBRA - INSTITUTO DE ENGENHARIA DE SISTEMAS E COMPUTADORES DE COIMBRA
- NOVA School of Science and Technology | FCT NOVA
- UNINOVA - Instituto de Desenvolvimento de Novas Tecnologias
- COFAC
- Escola Superior de Design, Gestão e Tecnologias da Produção de Aveiro - Norte da Universidade de Aveiro
- Faculty of Sciences of the University of Porto
- INESC TEC
- Instituto Português da Qualidade, I.P.
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- University of Porto
- Champalimaud Foundation
- FEUP
- INESC MN
- Instituto Nacional de Saúde Dr. Ricardo Jorge
- Instituto Politécnico de Lisboa
- Instituto de Geografia e Ordenamento do Território da Universidade de Lisboa
- NOVA.id.FCT- Associação para a Inovação de Desenvolvimento da FCT
- REQUIMTE - Rede de Quimica e Tecnologia
- Reitoria da Universidade de Lisboa
- Research Centre on Child Studies
- University of Minho
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Escola Superior de Educação João de Deus
- European Magnetism Association EMA
- Faculdade de Ciências e Tecnologia da UNL
- Faculdade de Medicina Veterinária
- IBMC
- Instituto Pedro Nunes
- Instituto Português de Oncologia do Porto Francisco Gentil (IPO Porto)
- Instituto Português do Mar e da Atmosfera, I.P.
- Nova School of Business and Economics
- S2AQUA – Collaborative Laboratory, Association for a Sustainable and Smart Aquaculture
- Universidade Nova de Lisboa
- Universidade do Minho - ISISE
- Universidade do Porto – HR
- University of Aveiro
- University of Beira Interior
- 36 more »
- « less
-
Field
-
and usability 2) increase the range of I/O optimizations supported by the library (e.g., deduplication, caching, scheduling) and 3) identify the limitations and required modifications to the platform
-
interface and usability and ; 2) increase the range of I/O optimizations supported by the library (e.g., deduplication, caching, scheduling).; These objectives are fundamental to improving the efficiency
-
, design, implement, and validate an optimization system for scheduling group classes within the Koachy platform. The specific goals include: Develop attendance prediction models for different types
-
. Grant duration: The grant, scheduled to start on December 2025, will last for 6 months with the possibility of renewal until the end of the project. Work plan: • Contacts with health units/health
-
will last for 6 months, scheduled to begin in January 2026, possibly renewable within the duration of the project. Monthly maintenance allowance amount: The amount of the scholarship corresponds
-
production team in the MNF, that focuses on the activities with private contracts and industrial partners. These positions are full-time positions that include 40 hours/week under a non-standard work schedule
-
to attend a duly scheduled teleconference call shall also be deemed excluded. V.2.3. After conducting and scoring the interviews, the Committee calculates the final score and ranks the candidates approved in
-
CIIMAR - Interdisciplinary Center of Marine and Environmental Research - Uporto | Portugal | 21 days ago
of the Coastal Biodiversity group, under the scientific supervision of Isabel Costa. 6. Duration of the contract: An unfixed-term employment contract scheduled to start on January 2026, under the legal terms in
-
in a degree granting course. 3. DURATION The scholarship will last for 6 months, scheduled to probably start at December 2025, and eventually renewable in accordance with the project's objectives
-
plans: Phd or non-degree granting course. 3. DURATION The scholarship will last for 6 months, scheduled to probably start at final December 2025, and eventually renewable in accordance with