Sort by
Refine Your Search
-
Listed
-
Country
-
Employer
-
Field
-
of this project for a one-year period (100% full-time commitment) to make a significant contribution to the implementation of machine learning (ML) algorithms. The postdoc is expected to have proven experience in
-
, hardware-adapted optimization, and error mitigation techniques, aiming to identify requirements, limitations, and pathways for improvement of both hardware and algorithms - analyze variational ansatz
-
aspects across a wide range of fields - from biomechanics and geophysics to polymer-fluid coupling. Further areas of interest include numerical algorithms for high-dimensional problems, classical (mainly
-
. The project’s overarching goal is the development of digital quantum algorithms for the simulation of non-abelian lattice gauge theories. We are looking for highly motivated individuals, with the desire
-
that algorithmic parameters are tuned so that the over-approximation of the computed reachable set is small enough to verify a given specification. We will demonstrate our approach not only on ARCH benchmarks, but
-
analysis, generation of metagenome assemblies) Ability to function as part of a team as well as independently. Ability to deliver results to required standard and schedule. Ability to organize and prioritize
-
information for up to two academic referees5)One writing sample or publicationIn order to receive full consideration, applications should be submitted by January 11, 2026. Interviews are tentatively scheduled
-
for Innovation and Development of FCT. 6. Fellowship duration: The scholarship is for an expected initial period of 12 months, scheduled to start in March of 2026. The scholarship contract may be eventually
-
.; - Participate in laboratory and field activities (flexible schedule) within the project scope.; - Test and validate the designed solutions in a real-world context and publish the results.; - The researcher is
-
is intended for the attribution of a Post-Doctoral Research Scholarship, for the time length time of 3 months, not renewable, scheduled to start on January 2026. 2. WORK PLAN AND WORKPLACE: The work