Sort by
Refine Your Search
-
Listed
-
Category
-
Field
-
the Directorate of Connectivity and Secure Communications. The ESA Programme Related to EU Secure Connectivity, hereinafter referred to as “Secure Connectivity”, is intended to support the effective development and
-
futures. It provides the Director General, the programme directorates and the broader Agency with insights and tools to set strategic goals, strengthen resilience and enable meaningful transformation. Using
-
) for the provision of utilities and common physical infrastructure and, as mandated, programme-dedicated infrastructure, as well as FM services, in accordance with specifically agreed customer requirements, and
-
computer programming with experience in developing software for experimental physics application; Understanding of electronic circuits and experience in simulations for the laboratory based project hands
-
Location ESTEC, Noordwijk, Netherlands Description Lead End-to-end Performance Engineer for the Copernicus Sentinel-2 (multi-spectral high-resolution optical observations of land and coastal waters) and Sentinel-3 (medium-resolution visible and infrared imaging) missions. The assignment covers...
-
supportive working relationships, communicate effectively and contribute to fostering positive attitudes to change and, therefore thus, to the success of an innovative programme. The potential to manage
-
This is a non-renewable post for a limited duration of 4 years. Location ESTEC, Noordwijk, Netherlands Description Navigation Systems Evolution Engineer in the Navigation Systems Definition Section, End to end Systems Division, Systems Department, Directorate of Technology, Engineering and...
-
home to the Space Safety Programme. As part of the Strategy Office, you will support key initiatives to enhance the Directorate’s impact, communications, and knowledge management. ESOC is to remain
-
systems, and the associated software infrastructure; leading the ground segment engineering assembly, integration and testing, and supporting the ground segment operational validation; supporting programme
-
Programme Board meetings as required and interfacing with the Director/Business Unit Controlling Office, as well as with Member States, for financial matters; supporting the preparation of Council meetings