Sort by
Refine Your Search
-
Information: This is a 2-year Postdoc Assignment. BNL policy requires that after obtaining a PhD, eligible candidates for research associate appointments may not exceed a combined total of 5 years of relevant
-
Compliance team. This individual’s primary responsibility will be to participate in the planning and conducting of independent comprehensive assessments of the security controls employed by BNL information
-
development institution whose purpose is to advance ideas and knowledge through a multidisciplinary program of basic and applied research. The Radiological Control Division (RCD) is seeking a qualified
-
Systems Integration Program (DSSI). This role resides in the Instrument and Controls group within DSSI, focusing on the development, deployment, commissioning, and maintenance of software for beamline and
-
work site and implement or suggest controls to minimize risk. Essential Duties and Responsibilities: Under minimum direction: Schedules, coordinates and tracks all routine and non-routine maintenance
-
and national challenges. Position Description The Electron-Ion Collider (EIC) project is seeking an accelerator physicist at the postdoc level to join the accelerator design team. Core duties are
-
workplace environment. Preferred Knowledge, Skills, and Abilities: You have hands-on experimental experience with 2D materials and heterostructure fabrication utilizing manual and/or automated 2D materials
-
the division Aid in overseeing the group’s postdocs Work collegially with the leaders in the Division to fulfill its mission Respond to new Department of Energy funding opportunities Oversee reporting of CMT
-
, Skills, and Abilities: Bachelor’s degree in Electrical Engineering or related engineering field 3 years experience with automation and controls using PLCs Comprehensive understanding of equipment interlock
-
. Required Knowledge, Skills, and Abilities: Bachelor’s degree in Electrical Engineering or related engineering field. 10 years experience with automation and controls using PLCs. Comprehensive understanding