Sort by
Refine Your Search
-
Listed
-
Employer
- Universidade de Coimbra
- Instituto Politécnico de Bragança
- Universidade Católica Portuguesa - Porto
- University of Trás-os-Montes and Alto Douro
- COFAC
- FARM-ID - Associação da Faculdade de Farmácia para a Investigação e Desenvolvimento
- FEUP
- INESC TEC
- Instituto Politécnico de Setúbal
- Instituto Superior Técnico
- Instituto Superior de Agronomia
- Instituto de Engenharia Mecânica
- Instituto de Saúde Pública da Universidade do Porto
- NOVA.id.FCT- Associação para a Inovação de Desenvolvimento da FCT
- UNIVERSIDADE DE ÉVORA
- Universidade do Minho - CTAC
- 6 more »
- « less
-
Field
-
. Develop and implement safety protocols and emergency procedures for reactor operation. Collaborate in the implementation of the control and automation system, including the installation of sensors and
-
command of English (min. B2). Preferred: • Experience in C and data engineering; • Previous experience in database development and/or maintenance; • Knowledge of Large Language Models (LLMs) applied to data
-
: Automation and Robotics Group, Department of Electrical and Computer Engineering, University of Coimbra. III- Scientific supervision/coordination of the grant: Hélder de Jesus Araújo IV - Work Plan / Goals
-
institutions. The objectives to achieve within this project are: Collaborate on maritime sensor deployment planning. Automate data collection and post-processing of maritime-sensor live feed. Create surrogate
-
computer systems administration d) Technical experience in managing virtualization and/or HPC platforms e) Good command of the English language (minimum B1 level) 3. Work plan: Technical functions
-
of genetic damage using the comet assay (primary and oxidative), and of histone H2AX phosphorylation by flow cytometry; d) Proficiency in the use of the Comet Assay IV (Instem) software; e) Good command
-
within the framework of project BlueWWater - Control, tratamiento y reducción de microplásticos y contaminantes emergentes en aguas residuales urbanas y en el medio costero transfronterizo, com a
-
prevention of breaches in command and control information security. Duration: The research fellowship(s) will have a duration of 09 months. It’s expected to begin in October/2025, and the contract is not
-
, review checkpoints, and delivery timelines; 5- Coordination and Oversight to ensure quality control, adherence to the artistic vision, and timely execution across all stages of production. LevelExcellent
-
research results in force at the FCT. For all grants, monitoring and control actions may be carried out by national and EU bodies in accordance with the applicable legislation in this area. Grant recipients