Sort by
Refine Your Search
-
health challenges such as parasitic nematodes. You should have a PhD or equivalent research degree in the Biological or Life Sciences. The post is available from 1st April 2025 until 31st March 2029
-
confirmation that you have been awarded your PhD, your salary will be increased to Grade 7, spine point 31. This post is offered on a 6 months fixed term basis, with the possibility of extension (funding
-
requirements. This post is fixed term until 31 July 2027. You should have, or be about to obtain, a PhD in Theoretical Computer Science, Mathematics, or a closely related field together with an excellent track
-
. A new team is being created, as part of the CHI-Zone, to develop tools to leverage information from health datasets to guide advancements in pharmaceutical research. Within this team, as Post-doctoral
-
. A new team is being created, as part of the CHI-Zone, to develop tools to leverage information from health datasets to guide advancements in pharmaceutical research. Within this team, as Post-doctoral
-
. This post is available on a fixed term basis until 30 November 2026, with the possibility of extension subject to funding. Commitment to Diversity The University of Liverpool is committed to enhancing
-
optimisation of an integrated power and transportation networks. This post is fixed term until 30 June 2025. If you are still awaiting your PhD to be awarded you will be appointed at Grade 6, spine point 30
-
, as part of a diverse, interdisciplinary team. The post is offered on a fixed term basis until March 2028. If you are still awaiting your PhD to be awarded you will be appointed at Grade 6, spine point
-
, Ecology or Environmental Sciences or another relevant area. Expertise in laboratory techniques is essential. Experience in protein purification and functional characterization is desirable. The post is
-
to travel and spend periods of time at CERN, PSI and other laboratories. The position is initially available until 30 September 2027. Extension of the post beyond this date will be subject to performance and