Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
- University of Aveiro
- Universidade de Coimbra
- International Iberian Nanotechnology Laboratory (INL)
- University of Minho
- Instituto Politécnico de Bragança
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Universidade de Aveiro
- Gulbenkian Institute for Molecular Medicine
- Universidade Católica Portuguesa - Porto
- FEUP
- INESC TEC
- Universidade do Minho
- University of Porto
- Associação Universidade-Empresa para o Desenvolvimento - TecMinho
- Aveiro University
- CIDMA
- Centro de Estudos Filosóficos e Humanísticos (CEFH) | Universidade Católica Portuguesa
- Centro de Estudos Sociais da Universidade de Coimbra
- Faculty of Sciences of the University of Porto
- ICETA - Instituto de Ciências, Tecnologias e Agroambiente da Universidade do Porto
- INESC ID
- Instituto Superior de Agronomia
- Instituto Terra e Memória
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- REQUIMTE - Rede de Quimica e Tecnologia
- S2AQUA – Collaborative Laboratory, Association for a Sustainable and Smart Aquaculture
- UNINOVA - Instituto de Desenvolvimento de Novas Tecnologias
- UNIVERSIDADE DE ÉVORA
- Universidade Católica Portuguesa
- Universidade Católica Portuguesa - CATÓLICA-LISBON
- Universidade Católica Portuguesa - RIO
- Universidade do Minho - ISISE
- University of Beira Interior
- University of Trás-os-Montes and Alto Douro
- 24 more »
- « less
-
Field
-
students. Fluent in English (written and spoken). Ability to work in a multidisciplinary team. 6. Selection Process The selection process must comply with article 5 of the RJEC. 7. Assessment criteria
-
9 Oct 2025 Job Information Organisation/Company University of Beira Interior Research Field Engineering » Electrical engineering Engineering » Computer engineering Researcher Profile First Stage
-
the process. 2.5 — Non-compliance with the deadline for submission of the application, as well as failure to submit or late submission of the documents, referred to in points 2.1 and 2.2, will lead to the
-
coastal urban ecosystems under light pollution”, supported by the Innovation and Digital Transition Program (COMPETE 2030), with the financial support by FEDER and national funds related to operation no
-
on the sustainable digital transition in container terminals through the modernization of gate-in, gate-out, and logistics control processes, simultaneously promoting operational efficiency and
-
Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID | Portugal | 22 days ago
objectives, compliance verification, proposal review, and support for budget preparation and justification; iii) Participating in process improvement initiatives to strengthen the support of the CEGIST Pre
-
the process. 2.5 — Non-compliance with the deadline for submission of the application, as well as failure to submit or late submission of the documents, referred to in points 2.1 and 2.2, will lead to the
-
Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S) | Portugal | about 21 hours ago
of the stress effects in fish” - No. 21286, Operation No. MPr-2024-9-21286 (COMPETE2030-FEDER-02232500, LISBOA2030-FEDER-02232500, ALGARVE-FEDER-02232500), co‑financed by the European Union through the Algarve
-
the continuation of the contract. g. Application dates From 22 September to 14 October, 2025. After 14 October (23h59 Lisbon time), 2025, applications will not be considered for evaluation. h. Application process
-
of the Agreement-Programme of Institutional Support Selection Procedure (articles 17, 19 and 28 of the Scientific Emplyment Regulation) signed between the Portuguese Foundation for Science and Technology, I.P. (FCT