Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
- INESC TEC
- Instituto Pedro Nunes
- Politécnico de Leiria
- Universidade de Aveiro
- FCiências.ID
- FEUP
- Universidade de Coimbra
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Nova School of Business and Economics
- Centro de Engenharia Biológica da Universidade do Minho
- National Laboratory of Energy and Geology
- Instituto Politécnico de Bragança
- University of Beira Interior
- Centro de Estudos Sociais da Universidade de Coimbra
- Faculdade de Ciências Médicas|NOVA Medical School da Universidade NOVA de Lisboa.
- Faculdade de Ciências Sociais e Humanas
- Faculdade de Medicina da Universidade do Porto
- Gulbenkian Institute for Molecular Medicine
- INEB - Instituto Engenharia Biomedica
- INESC ID
- Institute of Systems and Robotics, Faculty of Sciences and Technology of the University of Coimbra
- Instituto Politécnico de Beja
- Instituto Politécnico de Viseu
- Instituto Superior Técnico
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- Instituto de Telecomunicações
- LNEC, I.P.
- NOVA School of Science and Technology
- NOVA.id.FCT- Associação para a Inovação de Desenvolvimento da FCT
- Polytechnic University
- REQUIMTE - Rede de Quimica e Tecnologia
- Universidade Nova de Lisboa
- University of Algarve
- University of Aveiro
- 24 more »
- « less
-
Field
-
29 Aug 2025 Job Information Organisation/Company FEUP Department Human Resources Division Research Field Engineering » Computer engineering Engineering » Other Researcher Profile First Stage
-
D’Ávila e Bolama, 6201-001, Covilhã. Publication/notification of results: The final results of the evaluation process will be published in a sorted list, by the final classification obtained, and posted in
-
Plan: Processing of electricity network data for the execution of the project work plan; Analysis and simulation of the electrical network to assess constraints to MIBEL’s operation in PNEC’s time
-
: Processing of data from electricity markets for the execution of the project work plan. Development of modelling and simulation activities of the Iberian electricity market. Identification of market operation
-
the selection process, framed in the plan of activities and strategy of NIMSB and: In the frame of joint NIMSB and MDC research projects with co-supervision of an MDC investigator; Fellowship holders will have to
-
provided for the convenience of non-Portuguese speakers. However, only the full Portuguese version has official value for the evaluation and selection process. Title: B-0089-25 – Research Grant (BI) – 27/08
-
repository administration, scientific data management and the implementation of open access policies, with particular emphasis on the institutional repository; Implement practices for the processing
-
processing (GIS); d) Skills in processing survey or interview data, including systematization of interview information. Contracting requirements: Presentation of the academic qualifications and/or diplomas
-
-FCT), by the Research Fellow Statute (EBI), by the Norms for Grant Assignment and Management within R&D Projects, by the Code of Administrative Procedure (CPA), all in their current wording, and by
-
2025-10-01. .WORK PLAN: a) Suitability of Additive Manufacturing equipment for processing conditions and parameter study; b) Functional testing and execution of test specimens and prototypes; c