Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
- Universidade de Coimbra
- FEUP
- INESC TEC
- University of Minho
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- NOVA.id.FCT- Associação para a Inovação de Desenvolvimento da FCT
- Politécnico de Leiria
- Universidade Católica Portuguesa - Porto
- University of Aveiro
- Instituto Politécnico de Bragança
- NOVA School of Science and Technology | FCT NOVA
- REQUIMTE - Rede de Quimica e Tecnologia
- Universidade de Aveiro
- University of Beira Interior
- Instituto Superior Técnico
- University of Porto
- FCiências.ID
- Gulbenkian Institute for Molecular Medicine
- International Iberian Nanotechnology Laboratory (INL)
- Associação Fraunhofer Portugal Research
- Aveiro University
- Centro de Engenharia Biológica da Universidade do Minho
- Faculdade de Medicina da Universidade do Porto
- INESC ID
- INESC MN
- Instituto Nacional de Saúde Dr. Ricardo Jorge
- Instituto Pedro Nunes
- Instituto Politécnico do Cávado e do Ave
- Instituto de Ciência e Inovação em Engenharia Mecânica e Engenharia Industrial
- Instituto de Tecnologia Química e Biológica António Xavier ITQB NOVA
- S2AQUA – Collaborative Laboratory, Association for a Sustainable and Smart Aquaculture
- Universidade do Minho - CTAC
- Association for the Development of Industrial Aerodynamics
- Centro de Computação Grafica
- Champalimaud Foundation
- ESS - Escola Superior de Saúde
- Escola Superior de Design, Gestão e Tecnologias da Produção de Aveiro - Norte da Universidade de Aveiro
- European Magnetism Association EMA
- FARM-ID - Associação da Faculdade de Farmácia para a Investigação e Desenvolvimento
- Faculdade de Medicina Veterinária
- INESC COIMBRA - INSTITUTO DE ENGENHARIA DE SISTEMAS E COMPUTADORES DE COIMBRA
- Institute of Systems and Robotics-Faculty of Sciences and Technology of the University of Coimbra
- Instituto Superior de Agronomia
- Instituto Superior de Engenharia do Porto
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- Instituto de Telecomunicações
- LIP - Laboratório de Instrumentação e Física Experimental de Partículas
- Laboratório de Paisagens, Património e Território - Lab2PT
- NOVA Information Management School (NOVA IMS)
- NOVA School aof Science and Technology
- NOVA School of Science and Technology
- UNINOVA - Instituto de Desenvolvimento de Novas Tecnologias
- University of Trás-os-Montes and Alto Douro
- Value for Health CoLAB
- 44 more »
- « less
-
Field
-
Assessment of Stakeholders’ Needs (Task 1) • Data Analysis and development of machine learning models for optimized water management in the Almada Municipality (Task 3 and Task 4). • Support end-user training
-
to be developed consists of: Data Structuring and Optimization for Language Models:Implement routines for the collection, cleaning, and pre-processing of educational data; Establish methodologies
-
, and teaching approaches, optimizing the learning experience. Implementation of Motivational Elements and Immersive StorytellingDesign and apply gamification elements, such as point systems, achievements
-
resulting from anaerobic digestion, based on energy-efficient technological innovations. The work plan for this grant includes the development and optimization of the NETmix gas/liquid injector to maximize
-
-time monitoring.; • Develop numerical models to simulate the dynamic behavior of mooring and anchoring systems under different environmental conditions.; • Analyze and optimize structural performance and
-
professionals’ benefit from an optimized learning experience, based on digital technologies and simulation methodologies. 5. Applicable legislation and regulations The call and the respective award
-
programme Is the Job related to staff position within a Research Infrastructure? No Offer Description A Research Fellowship (BI) (Reference REQUIMTE 2025-62) on the project “FODMAPS - Food Optimization
-
) Classification of industrial equipment and fault localization functions, based on methods that are already studied and understood, but not yet computationally optimized or operational in real time; 3) Power
-
, including the optimization of abiotic/biotic electrochemical communication, and the investigation of strategies for product upgrade, leading to the development of a hybrid electrosynthesis system for CO2
-
de Informática Workplan: The activities to be developed will consist of research and development of new methodologies that allow optimizing the presential and remote support services provided by DSI