-
) construction of a laboratory-scale prototype for the electrochemical generation of ozone; (ii) testing and optimization of the electrochemical ozone generation system; (iii) testing and optimization
-
established there must be fulfilled until the time of signing the contract. Activity Outline: The recruitment aims at the performance of R&D work to study and optimize the operation of a biomass boiler fed with
Searches related to optimization
Enter an email to receive alerts for optimization positions