Sort by
Refine Your Search
-
Listed
-
Category
-
Field
-
materials and electronics. The PhD student in Cambridge will work on switching in oxide films and will involve film growth by pulsed laser deposition as well as use of a wide variety of characterisation tools
-
of people attending EDs for all health issues is rising, leading to longer waiting times. There is also growing appreciation that "mild" is a misnomer as these patients may have ongoing functional
-
A position exists, for a Research Assistant/Associate in the Department of Engineering, to work on structural timber engineering. The post holder will be located in West Cambridge, Cambridgeshire
-
Heritage Science. The post holder will work as part of the AHRC-funded project: "Small performances": investigating the typographic punches of John Baskerville (1707-75) through heritage science and practice
-
of the successful applicant. Duties include undertaking your own program of research and assisting with ongoing research programmes; writing up results for publication; and presenting your work to colleagues
-
, and performance testing using techniques such as scanning and transmission electron microscopy, diffraction methods (lab-based and synchrotron), mechanical property assessments, and thermo-physical
-
strategies. Therefore, the process and material must be evaluated simultaneously. DAC is limited by the energy input needed to regenerate the sponge. Using heat forces the process to use much more energy than
-
Trust. The successful candidate will work closely with the PI and a PhD student within a larger cross-disciplinary team to construct a quantitative computational model of carbonate biomineralisation
-
supports equality, diversity and inclusion and encourages applications from all sections of society. The University has a responsibility to ensure that all employees are eligible to live and work in the UK.
-
We have funding for a number of 1+3 MRes/PHD studentships, in collaboration with industry, as part of our EPSRC Centre for Doctoral Training in Future Infrastructure and Built Environment: Unlocking