Sort by
Refine Your Search
-
that are needed in many key physics measurements. In order to maintain its current efficiency and momentum resolution in the challenging conditions of High-Luminosity LHC, the ECAL is in the process of a major
-
biasing and current injection complete the setup. Extensive specimen preparation facilities include a dual-beam FIB-SEM (ThermoFisher Helios Nanolab 600i) equipped with Omniprobe micromanipulator and 5 gas
-
for a period of 12 months, this contract may be extended for a further 6 months. In addition to submitting a CV and covering letter on the CNRS jobs portal, applicants are asked to send a 2-page letter
-
). This revolutionary detector is due to be installed during the intensive maintenance period preceding run 4 of the LHC. You will play a key role in creating a qualification and certification system for the assembled
-
history of France during the same period. - A command of written French; a good knowledge of English; knowledge of modern foreign languages (German, Italian, Spanish or other) will be considered
-
, without ever trapping the atoms. The approach thus follows a different path from most current projects, which target an operation on an extremely fine line, and involve a more complex method of manipulating