Sort by
Refine Your Search
- 
                Listed
- 
                Field
- 
                
                
                numerical methods for complex flows Legislation and regulations: Law Nº. 40/2004, of 18th August, in its current wording (Statutes of Scientific Research Fellow) and Regulation of Research Grants of Fundação 
- 
                
                
                1 Oct 2025 Job Information Organisation/Company FEUP Department Human Resources Division Research Field Engineering » Computer engineering Computer science » Other Researcher Profile First Stage 
- 
                
                
                2025, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will 
- 
                
                
                an exclusive basis, eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 9 months estimated in the previous paragraph, this duration will be adjusted 
- 
                
                
                5 Sep 2025 Job Information Organisation/Company FEUP Department Human Resources Division Research Field Engineering » Computer engineering Engineering » Electrical engineering Researcher Profile 
- 
                
                
                starting date in november 2025, on an exclusive basis eventually renewable but never exceeding the end of the project. If it is not possible to ensure the duration of 6 months estimated in the previous 
- 
                
                
                renewable but never exceeding the project duration. If it is not possible to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted according to the end date 
- 
                
                
                to ensure the duration of 6 months estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided that the minimum duration of 3 consecutive months 
- 
                
                
                of 6 months estimated in the previous paragraph, this duration will be adjusted according to the end date of the project, and provided that the minimum duration of 3 consecutive months is guaranteed, in