Sort by
Refine Your Search
-
Listed
-
Field
-
the scientific supervision of Professor Ana Rosanete Lourenço Reis. Grant duration: Initial duration of 12 months, with the predicted starting date in january 2026, on an exclusive basis eventually renewable but
-
Magalhães Mendes. Grant duration: Initial duration of 3 months, with the predicted starting date in December 2025, on an exclusive basis eventually renewable but never exceeding the end of the project
-
the scientific supervision of Professor Abílio Manuel Pinho de Jesus and Professor Rúben Filipe da Silva Santos. Grant duration: Initial duration of 6 months, with the predicted starting date in December 2025
-
Innovation in Health, under the scientific supervision of Professor Fernão D. Magalhães and Doctor Artur M. Pinto, and on an exclusive basis. Grant duration: Initial duration of 6 months, with the predicted
-
the scientific supervision of Professor Manuel José Vieira Simões. Grant duration: Initial duration of 3 months, with the predicted starting date in December 2025, on an exclusive basis eventually renewable but
-
duration of 8 months, with the predicted starting date in January 2026, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure the duration of 8
-
of Engineering of the University of Porto (FEUP), under the scientific supervision of Dra. Daniela Sofia de Castro Falcão. Grant duration: Initial duration of 6 months, with the predicted starting date in November
-
the University of Porto (FEUP), under the scientific supervision of Doctor Maria José Fernandes Sampaio. Grant duration: Initial duration of 9 months, with the predicted starting date in November2025, on
-
: Initial duration of 6 months, with the predicted starting date in December 2025, on an exclusive basis eventually renewable but never exceeding the project duration. If it is not possible to ensure
-
duration: Initial duration of 3 months, with the predicted starting date in November 2025, on an exclusive basis, eventually renewable but never exceeding the end of the project. If the contracting