Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
- Universidade de Coimbra
- FCiências.ID
- FEUP
- Instituto Superior Técnico
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- UNIVERSIDADE DE ÉVORA
- University of Porto
- COFAC
- Escola Superior de Saúde do Politécnico do Porto
- Faculdade de Medicina da Universidade do Porto
- Faculty of Sciences of the University of Porto
- ISCTE - Instituto Universitário de Lisboa
- Instituto Superior de Economia e Gestão
- Instituto Superior de Engenharia do Porto
- Instituto de Engenharia Mecânica
- Instituto de Telecomunicações
- REQUIMTE - Rede de Quimica e Tecnologia
- Seed Robotics
- University of Beira Interior
- University of Trás-os-Montes and Alto Douro
- 10 more »
- « less
-
Field
-
the possibilities of additive manufacturing technologies, including design limitations for stainless steel (or other alloys) for sCO2 applications. Applicant - specifications: in addition to the general
-
“Nitroscope: Scoping European N fluxes for sustainable N management and conservation practices” (Ref. HORIZON-MISS-2024-SOIL-01-04-101218902), financed by European Union´s Horizon Europe Research & Innovation
-
-ADG - ERC ADVANCED GRANTS. Scientific Area: Neurobiology/Regeneration 1. Project summary and work plan It is widely documented that the adult mammalian central nervous system (CNS) does not regenerate
-
of the respective institutions and also: Co-design of intervention implementation plans with community institutions participating in the project; Recruitment of families as study participants; Monitoring the data
-
Code, as published in Decree-Law No. 4/2015, of January 7th, in its current version (CPA). IV. Work plan The researcher will participate in the development of behavioural, molecular biology, genetics
-
4 of Decree-Law No. 74/2006 of 24 March and must be developed in a higher education institution in association with at least one R&D unit, including a course plan in one or several research areas
-
-Law No. 4/2015, of January 7th, in its current version (CPA). IV. Work plan The work plan to be executed includes the following tasks: 1) Review and update of the databases of the LTsER Montado
-
the performance of the building classes using the SUPERB framework 5- Development of new seismic design procedures for new buildings 6- Development of new seismic retrofit procedures for existing buildings
-
membrane processes, namely by carrying out environmental analyses that allow concluding on the efficiency of the applied treatment processes, and preparing reports on these works. Work plan: The proposed
-
with less than 17 points in the curricular evaluation will not be invited for the interview. In the interview (40%) topics related with the work plan, experience and the candidate’s CV will be discussed