Sort by
Refine Your Search
-
framework of project “EASYSanding-Intelligent sanding, inspection and control system for the production of bicycle frame”, with nr. 18464 and operation code at the Funds Platform COMPETE2030-FEDER-01484100
-
Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID | Portugal | 3 months ago
control algorithms for the robot Vizzy. Duration: The research fellowship(s) will have the duration of 10 months. It’s expected to begin in March 2025 and may be eventually renewed up to the maximum of 24
-
to be achieved: In the production of high end natural cork bottlestoppers, quality control and pricing is assured by several stages of visual inspection. This process involves craftsmanship as
-
to be achieved: In the production of high end natural cork bottlestoppers, quality control and pricing is assured by several stages of visual inspection. In this taks, experienced factory workers evaluate
-
or experience in research projects related to agrivoltaics, renewable energy for agriculture, or sustainable agriculture. - Ability to analyse data and produce scientific documents. - Good command of English and
-
internationally refereed scientific journals, in the scientific areas for which the competition is open, c) Proven command of the English language (oral and written); d) Immediate availability to work at UTAD (in
-
with the open access rules for data, publications and other research results in force at the FCT. All grants may be monitored and controlled by national and EU bodies in accordance with the applicable
-
, for which documentary evidence must be provided: Degree in Biochemistry or related areas1; Be a student enrolled in a master's degree program in the area of pharmaceutical sciences, quality control, food