Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
- University of Groningen
- European Space Agency
- Wageningen University and Research Center
- AcademicTransfer
- Utrecht University
- Radboud University
- Wageningen University & Research
- Leiden University
- University of Amsterdam (UvA)
- University of Twente
- Delft University of Technology (TU Delft)
- Erasmus University Rotterdam
- CWI
- KNAW
- Nature Careers
- University of Twente (UT)
- Vrije Universiteit Amsterdam (VU)
- Eindhoven University of Technology
- Maastricht University (UM)
- Royal Netherlands Academy of Arts and Sciences (KNAW)
- Amsterdam UMC
- Eindhoven University of Technology (TU/e)
- Erasmus MC (University Medical Center Rotterdam)
- Koninklijk Nederlands Meteorologisch Instituut
- Leiden University Medical Center (LUMC)
- NIOZ Royal Netherlands Institute for Sea Research
- Tilburg University
- 17 more »
- « less
-
Field
-
Automation group will develop novel machine-learning based control algorithms that allow for real-time adjustment of OSA therapy. The main challenge is to develop robust machine learning algorithm which can
-
participation in feasibility studies, project reviews and evaluation of procurement proposals regarding EMC aspects; definition and assessment of EMC test, control and verification plans and procedures for space
-
reviews and evaluation of procurement proposals; definition and assessment of test, control, and verification plans and procedures of space equipment and systems; supporting EMC test campaigns; assessment
-
, power units and/or control units Project support experience for Earth observation, navigation, telecommunication, human spaceflight and exploration missions Experience in the design, development and
-
-controlled physical conditions (pressure, temperature). The department of Mechanical Engineering (https://www.tue.nl/en/our-university/departments/mechanical-engineering ) performs top-notch research and
-
tasks. You will have the opportunity to support the management of the development of LCRS structures, MMOD protection systems, mechanisms, the thermal protection system, the thermal control system and the
-
(GTO) before raising its orbit to the Geostationary Graveyard Orbit (GGO). There, it will rendezvous with and capture a customer satellite, demonstrate attitude control take-over of the customer
-
Officerl, the procurement and implementation of the selected activities via the S2P workplans, and liaise with the procurement, legal, financial, risk, schedule, controlling and outreach services supporting
-
to allow mass-production, integrate a wide variety of sensors, and built systems (setups) that can do fluidic control and allows for automated experiments. Set up equipment, laboratories needs and operation
-
Management Authority (IPMA) is intended to address project management challenges by institutionalising project management and control process ownership, alongside initiatives in digitalisation, compliance