Sort by
Refine Your Search
-
flight programmes, except those entrusted to other departments; complementing the Ariane 6 development and implementing the Ariane 6 Competitiveness improvement programme; implementing Prometheus as from
-
its role as Design and Procurement Agent, under the programme management of the European Commission (EC). Version 3 of the system is currently under procurement under Phase CD. The Division is also
-
2025 and then the future budget 2028 to match and complement as well as possible the future MFF and vice-versa. This effort demands internal interactions with programme directorates and an important
-
innovation hub” connecting EO with a growing ecosystem of disruptive and transformative innovation like AI, ML, Quantum Computing, Edge Computing, Metamaterials, Photonics, etc.. Many of the challenges posed
-
programme in 2008. Through the CCI, ESA is developing a suite of global data records of key components of the climate system, known as Essential Climate Variables (ECVs). The climate-quality datasets produced
-
Space Agency (ESA) is leading a programme to advance the European capabilities for developing a LEO-PNT system and support Europe in remaining a leader in the world-wide space-based positioning
-
to study) in the UK are eligible to apply for this internship. Our team and mission ESA’s ‘Space for 5G/6G & Sustainable Connectivity’ strategic programme line is advancing 5G and 6G technologies to support
-
of flight operations for all ESA missions. For this purpose, the Mission Operations Department is the primary interface of OPS towards the Programme Directorates. In addition to operational support to ESA
-
its role as Design and Procurement Agent, under the programme management of the European Commission (EC). Version 3 of the system is currently under procurement under Phase CD. The Division is also
-
computer and Data Handling (PL/PF) for space systems, including their procurement and end-to-end validation (in close collaboration with TEC-EF); Engineering of on-board software in all phases including pre