Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Field
-
of the Decree-Law no. 66/2018, of august 16th, and any formalities established there must be fulfilled until the time of signing the contract. Activity Outline: The work plan is part of Activities WP1 (Rainwater
-
requirement to be verified at the time of hiring. or - Hold an academic degree and be enrolled in a non-degree-granting course that is part of the educational project of a higher education institution
-
integration between mechanical components, actuators, sensors, and control systems. The candidate will participate in all stages of the project, from the design and definition of the automation architecture
-
until the time of signing the contract. Activity Outline: The work to be developed aims at the recovery of ammonia from landfill leachates using degasification membranes, as part of WP5 – Renewable Gases