Sort by
Refine Your Search
-
interests. Additional Information: This is a part-time, fixed-term position. This position is overtime ineligible. This position works on-site (in-person) at the WSU Tri-Cities Campus, in Richland, WA. Annual
-
: The screening of applicants begins June 25, 2025. This is a part time (50% FTE), project position. This position is overtime eligible. Project End Date: This is a project position expected to end one year from
-
the Elson S. Floyd College of Medicine fundraising goals by planning and conducting outreach designed to promote constituent understanding of the Elson S. Floyd College of Medicine activities and research
-
. Additional Information: This is a part-time (50% FTE), temporary project appointment expected to end on June 30, 2026. Renewal is dependent on program needs and/or if additional funding is secured to extend
-
; participating as part of the Chancellor’s Senior Staff (Associate Vice Chancellors, Directors, etc.); and providing input on policy and procedural matters. Additional Information: This is a full time (100
-
the department. As the Director, you will engage, support and advise student-athletes as it pertains to NIL and meeting with student-athletes and advising them on matters pertaining to NIL will be a large part of
-
part of a cluster hire within the Institute for Northwest Energy Futures (INEF). Although all areas of electrical engineering will be considered, research emphasis will be on the power electronics and
-
-month) with the potential for renewal. Part-time positions may be negotiable, teaching is in-person and remote work is not available. It is anticipated that the successful candidate(s) will begin the
-
part of a quality assurance program. Assist in the development and evaluation of new procedures. Prepare and verify the quality of reagents, standards, and control samples. Calibrate, troubleshoot
-
Information: This is a full/part time (100% FTE), project position. This position is overtime eligible. Temporary End Date: This is a temporary position expected to end on 7/31/2026. Renewal is dependent