Sort by
Refine Your Search
-
Listed
-
Category
-
Employer
-
Field
-
preferred but not required - candidate can learn on the job; Eager to learn new technologies and try new ideas in a structured way; Willingness to work in the industry in the future as a digital AI
-
numbers of minimally-interpretable models being used, as opposed to traditional models like decision trees, or even Bayesian and statistical machine learning models. Explanations of models are also needed
-
materials, formulations and procedures to create particles, for outputs aligned with both academic advancement and industry partners. Materials will be evaluated for size, morphology and structure-function
-
$47,000 per annum (2025 rate). A four year Project Expense and Development package of $13,000 per annum. A 60 day Industry Engagement component with the industry partner. A structured professional
-
to building structure-activity relationships (SARs) based around targeted modifications of their patented gold-based drug candidate using innovative in vitro protocols to refine lead drug candidate(s). This
-
to the damage tolerance design of structures. Cyclic loading causes adverse effects and leads to accumulated damage and degradation of residual strength in composite laminates. Predicting the residual strength
-
the area of structural health monitoring of civil engineering structures on an Australian Research Council Future Fellowship project “Innovative Data Driven Techniques for Structural Condition Monitoring
-
of $13,000 per annum. In addition, this program offers: A 60-day Industry Engagement component with the industry partner (Gold Hydrogen Limited), and A structured professional development and training program
-
enhance overall farm productivity and profitability while minimising environmental impact. Scholarship includes 60-day Industry Engagement component with the industry partner and a structured professional
-
. Project expenses may include lab consumables, fieldwork, attendance at top-tier conferences and other research costs. A three-month industry engagement component with the industry partner. A structured