Sort by
Refine Your Search
-
Listed
-
Category
-
Program
-
Employer
- INESC TEC
- Instituto Pedro Nunes
- Universidade de Coimbra
- FCiências.ID
- Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID
- Nova School of Business and Economics
- University of Beira Interior
- Centro de Computação Grafica
- Centro de Engenharia Biológica da Universidade do Minho
- FEUP
- INESC ID
- Instituto Politécnico de Bragança
- Instituto Superior de Engenharia do Porto
- Instituto de Telecomunicações
- National Laboratory of Energy and Geology
- Nature Careers
- FARM-ID - Associação da Faculdade de Farmácia para a Investigação e Desenvolvimento
- INESC COIMBRA - INSTITUTO DE ENGENHARIA DE SISTEMAS E COMPUTADORES DE COIMBRA
- Politécnico de Leiria
- Universidade dos Açores
- ASSOCIACAO ISCTE CONHECIMENTO E INOVACAO - CENTRO DE VALORIZACAO E TRANSFERENCIA DE TECNOLOGIAS
- Association for the Development of Industrial Aerodynamics
- COFAC
- Faculdade de Ciências e Tecnologia da UNL
- Faculdade de Medicina da Universidade do Porto
- Faculty of Pharmacy of the University of Lisbon
- Faculty of Sciences of the University of Porto
- Forward College;
- Gulbenkian Institute for Molecular Medicine
- Institute of Systems and Robotics, Faculty of Sciences and Technology of the University of Coimbra
- Institute of Systems and Robotics-Faculty of Sciences and Technology of the University of Coimbra
- Instituto Politécnico de Beja
- Instituto Politécnico de Coimbra
- Instituto Superior Técnico
- Instituto de Engenharia Mecânica
- Instituto de Investigação e Inovação em Saúde da Universidade do Porto (i3S)
- Instituto de Tecnologia Química e Biológica António Xavier ITQB NOVA
- LNEC, I.P.
- NOVA School of Science and Technology | FCT NOVA
- REQUIMTE - Rede de Quimica e Tecnologia
- S2AQUA – Collaborative Laboratory, Association for a Sustainable and Smart Aquaculture
- Universidade Nova de Lisboa
- University of Aveiro
- University of Minho
- 34 more »
- « less
-
Field
-
Associação do Instituto Superior Técnico para a Investigação e Desenvolvimento _IST-ID | Portugal | 5 days ago
Program Workplan: The objectives of the work include the preparation and assembly of an experimental installation, including a green wall and green roofs for integrated urban water management. The candidate
-
related fields. Admission Requirements: a) To be enrolled at a PhD, or declaration of honor in which undertakes to be enrolled until the grant's contract is done. Workplan and the objectives to achieve
-
for the Socio-Ecological Systems Research Group, Socio-Ecological Resilience Topic of CIMO. Specifically, the objectives of the work coincide with the goals to be achieved in Activity 1 of the project, which
-
holders" (https://www.inesctec.pt/pagamento-propinas-bolseirosEN ) The grant holder will benefit from health insurance, supported by INESC TEC. 2. OBJECTIVES: The main objectives of the Grant
-
/pagamento-propinas-bolseirosEN ) The grant holder will benefit from health insurance, supported by INESC TEC. 2. OBJECTIVES: The overall vision of the ATE is to deploy and demonstrate a set of business models
-
development of research activities within the scope of the project FireSys – “Intelligent Decision Support System for Management of Wildfires”, with the objective of developing a solution that enables
-
the preservation and promotion of biodiversity, heritage, and maritime culture. Its overall objective is to promote dialogue and collaboration among multiple key stakeholders, aiming to increase knowledge about the
-
PRR - Recovery and Resilience Plan and by the Next Generation EU Funds, under the following conditions: Work Plan and Objectives to Reach – The selected candidate will develop research and development
-
with reference number BI|2025/749 under the scope of the Project CARMA – Refª 101168355 funded by European Commission – Program Horizon Europe, is now available under the following conditions: OBJECTIVES
-
The duration of the grant is for 6 months, probably starting in September of 2025, eventually renewable, up to the limit set out in the RBI-ISEP. 4. ACTIVITY OBJECT / WORK PLAN The project will involve: i